Hydrological and geohydrological study of a ditch
Reference case Rijtgracht in Avelgem
Drinking water network modelling
Reference case Wortegem-Petegem
Integrated solution for flooding
Reference case municipality of Beersel
Cost-effective organisation of operational sewerage and drinking water management
Reference case Farys
Flood study on an industrial site
Reference case Janssen Pharmaceutica Beerse
Surface water modelling to mitigate flood damage
Reference case Blauwhuisbeek
Integrated water management leads to 12 % reduction of on-site water consumption
Reference case Brussels Airport (Belgium)
Water discharge master plan on an industrial site
Reference case TOTAL
Buffer facilities and discharge canals avoid flooding
Reference case The Comberg site - Youth Hostel Voeren
Reduce water consumption and wastewater discharge at a zoo
Reference case The Zoo of Antwerp
Master plan for sustainable water management in an urban residential area
Reference case Ecowijk Gantoise Ghent
LeakRedux®: Water leakage can go down to 5.2% driven by timely leak detection and repair
Reference case pilot project Hai Phong (Vietnam)
Saving potential of 63% or € 2.5 mio/year on sewerage management
Reference case municipality of Mol
Regional master plans for drinking water and sewerage
Reference case Bulgaria
Rainwater and wastewater master plans
Reference case Limassol Cyprus
Creation of a flood map as a result of runoff
Reference case All of Flanders - 2018
Climate impact of changing precipitation patterns on local watercourses
Reference case City of Antwerp
Integrated water management
Reference case municipality of Knokke
Pilot project - De Watergroep (Belgium)
Successful pilot project at Flanders largest water supply utility of Flanders (Belgium) (July 2018)
Establishment of rainwater plans
Reference case FARYS' working area
Flood4Cast® predicts flood risks at street level in city of Antwerp
In collaboration with Imec and Vito
Reference case Hanoi Water Company Hawacom (Vietnam)
LeakRedux® to reduce leakages in water supply network from 17,5% to 10%
Flood modelling and climate adaptive scenario planning up to 10 times faster.
Reference case All of Flanders – VMM (Nov 2022)
Call or mail us
Interested? How can we help you?
Send an email or call +32 16 24 05 05.